A design language for a national grid operator

Seven internal products, seven visual languages, one control room. We unified them without stopping a single release.

Client

Volta Grid

Sector

Energy

Year

2023

Duration

24 weeks

7 → 1

products on one system

Scope of work

Design system, Component library, Governance, Training

The write-up

Written by the people who did the work, not a marketing team.

Volta Grid operates national transmission infrastructure through seven internal applications, each built by a different team in a different decade. Operators moved between them all day and made mistakes at the seams.


No release freeze


The non-negotiable was that no team would pause shipping. So we built the system as a parallel track: tokens first, then primitives, then the components with the highest cross-product usage.


Each team adopted at its own pace against a shared migration checklist. Two products completed inside a quarter. The slowest took a year, and that was fine.


Governance that survives


A design system with no owner is a folder. We set up a rotating stewardship model — one engineer and one designer per quarter — plus a public request process with a published response time.


Result


Seven visual languages became one. Control-room error rates at the application seams dropped measurably in the first year, and the system has outlived two reorganisations.

Have a project with a number attached to it?

Create a free website with Framer, the website builder loved by startups, designers and agencies.